Sen. Angus King Tours TechPlace, Meets STARC April 6th, 2016 Senator Angus King of Brunswick stopped by on Friday, Feb. 5th for a short tour. Read The Full Article Here>> Subscribe to our Blog Recent Posts Temporary Walls Compared to Demising Walls: 5 Questions AnsweredConstruction Trends Driving Jobsite Efficiency: Why Temporary Walls Are the FutureSustainable Construction ROI: Reusable Walls That Save and ScaleICRA Barriers: How to Renovate Healthcare Facilities Without Disrupting Patient CareWhy Poly Sheeting Is No Longer Enough for Containment Categories Infection Control (47)Healthcare (38)News (31)temporary walls (24)temporary construction walls (24)temporary wall systems (24)ICRA Containment Barriers (23)Temporary Containment Walls (21)Construction (18)Fire Safety (16)Healthcare Construction (13)Healthcare Renovation Projects (10)Dust Containment System (10)Infection Control Protocols (10)pandemic preparedness (8)Advantages (8)Modular Wall Construction (8)healthcare facilities (8)ICRA barriers (7)dust barrier alternatives (7)fire rated barrier (6)Modular Wall Systems Company (6)infection control construction (6)Commercial (6)Hospital Preparedness (6)Patient Satisfaction (5)Infection Prevention Hospitals (5)hospitality (5)life sciences (4)Fire Codes (4)Sustainable Manufacturing (4)Healthcare Associated Infection (4)data centers (3)Airports (3)icra 2.0 (3)Class A Office Space (3)lightweight temporary wall system (2)LiteBarrier (2)modular walls (2)Renovation Projects (2)modular temporary construction walls (2)astm e90 (2)sustainable construction (2)commercial applications (2)Temporary Reusable Construction Walls (2)Construction Cost Reduction (2)Construction Project Management (2)STARC Walls (2)mission-critical facilities (1)data center renovation (1)noise control (1)construction best practices (1)fire-rated walls (1)reusable barriers (1)phased construction (1)construction containment (1)reusable temporary walls (1)negative air (1)patient isolation rooms (1)rent temporary walls (1)healthcare-acquired infection (1)HAI (1)lightweight temporary walls (1)Construction Safety (1)STARC Systems (1)door (1)Smoke Development Index (1)Flame Spread Index (1)Fire Safety in Construction (1)Sound Attenuation (1)Fire Resistance Testing (1)Construction Industry Standards (1)Commercial Construction Safety (1)Building Material Classifications (1)ASTM E84 Certification (1)ASTM E119 Fire Standards (1)ASTM Compliance (1)Competition (1)Reusable Containment Walls (1)demising walls (1)data center construction (1)Modular Wall Systems (1)polycarbonate alternative (1) See all