Welcome to the New STARC Experience 💫

New Site, No Disruptions

 

Our Vision

Eliminate the disruption of construction

Undisrupt: A new word. A new way forward.

Construction in occupied spaces has always meant mess, noise, and interruption. We decided that wasn’t good enough. So we created a new way to build — one that keeps people working, living, and thriving while transformation happens behind the wall.

Undisrupt defines that shift. From chaos to control. From compromise to continuity. From “under construction” to business as usual. So yeah, we made up a word. But more importantly, we made a better way.

Built for purpose

Every STARC innovation is born from the jobsite — solving real problems with precision and purpose. Designed to work smarter, install faster, and last longer. It’s why project leaders don’t just choose STARC, they join the mission to Undisrupt.

Ready for anything

Crafted with quality and pride right here in the USA — and backed by a total of 130,000-square-foot facility built to deliver at scale. Whatever the ever-changing construction industry throws next, we’re ready.

Undisrupted Experience

We serve the places where stopping isn’t an option. Renovation used to mean dust, noise, and downtime — especially in healthcare, where disruption isn’t just inconvenient, it’s unsafe.

We set out to change that. STARC walls create real separation between construction and operation, turning noisy job sites into calm, professional environments where business — and life — keep moving.

Built for an undisrupted experience:

  • Look like real walls — so environments stay professional and reassuring.

  • Block sound — so hammering and drilling fade into the background.

  • Seal tight — with negative air options that keep dust where it belongs.

Undisrupted Protection

In occupied environments, protection goes beyond barriers. Construction happens beside patients, travelers, equipment, and data — all of which need more than “good enough.”

So we created the new standard. STARC walls defend what matters. Engineered for safety, security, and code compliance, every system is fully tested and proven to perform under pressure.

Built for undisrupted protection:

  • Seal tight — exceeding ICRA Class IV/V standards for dust and pathogen control.

  • Block fire and smoke — Class A flame spread; FireblockWall™ is the only reusable 1-hour rated wall.

  • Lock down access — modular door options integrate easily with existing security workflows.

Undisrupted Budgets & Timelines

Traditional temporary drywall hides real costs — specialized crews, demo, disposal, dust control, and downtime. The result? Bloated budgets and blown schedules disguised as “just part of the process.”

We didn’t buy that. STARC systems replace waste with efficiency. Reusable panels install fast, reconfigure easily, and pay for themselves after just a few uses — delivering predictable schedules, leaner budgets, and less downtime.

Built for undisrupted performance:

Projects that move faster

Install 100 feet in an hour. No specialists. No slowdowns.

Investments that pay back faster

Durable, reusable panels pay back fast — then keep paying forward.

Undisrupted Planet

Single-use drywall isn’t just wasteful — it’s outdated. Every demo day fills dumpsters, fuels more hauls, and drives more material straight to the landfill.

STARC panels are reusable, recyclable, and responsibly made in Brunswick, Maine, in a facility powered by biofuel and solar energy. Every wall is built to last, project after project. 

Built for an undisrupted planet:

  • Reduce waste — reusable panels replace single-use drywall again and again…and again.

  • Lower embodied carbon — fewer new materials and transport miles across projects.

  • Manufactured responsibly — clean energy, recyclable materials, minimal packaging.

A Construction Game-Changer

“STARC isn’t just a temporary solution; it’s a long-term strategy.”

Lynsey Jones

Project Senior Manager, McCarthy Building Companies, Inc.

Redefining Construction in Operational Environments

Undisrupting construction isn’t just something we say — it’s in our DNA. Since 2014, when a third-generation builder knew there had to be a better way, STARC has been on a mission to make renovation faster, cleaner, safer, and more sustainable in live, occupied spaces. Every innovation since has pushed that mission forward, turning a simple idea into an industry shift.

2024

StackBarrier™ redefines how temporary walls are built at height — with a self-supporting design that makes tall containment simple.

2023

North Branch Capital invests in STARC, backing our 38% growth, 81 NPS, and leadership with 58 of the Top 75 contractors — powering the next chapter of innovation and expansion.

2022

FireblockCap™ launches — simplifying above-ceiling fire code compliance. Innovation and growth earn STARC a FacilitiesNet Vision Award and its fourth consecutive Inc. 5000 honor.

2021

FireblockWall™ launches — the first reusable, 1-hour fire-rated temporary wall. STARC earns a third consecutive Inc. 5000 recognition.

2019

LiteBarrier® builds on RealWall® innovation — a lighter, more agile system that brings STARC performance to spaces where mobility is key. STARC named to Inc. 5000 for rapid growth.

2017

Recognizing a wider need beyond healthcare, STARC secures Blue Heron Capital investment to scale operations and innovation.

2014

RealWall® launches — setting the healthcare-grade standard and igniting the Undisrupt mindset.

STARC WALLS ARE EVERYWHERE

Transforming Construction in Every Environment

From hospitals and airports to offices and data centers, STARC walls are changing how construction gets done.

Used in all 50 states (yep, even Alaska!) and around the world, our systems deliver safer, quieter, more predictable renovations — everywhere people live and work.