# STARC Systems > STARC Systems manufactures reusable modular temporary wall systems for occupied > construction environments. Founded 2014, headquartered in Brunswick, Maine. > Products replace single-use drywall with sound-blocking, dust-sealing, fire-rated > modular panels that install in hours and are reusable 50+ times. > Serves healthcare, airports, data centers, hospitality, education, retail, > commercial offices, and life sciences/biotech. > Works with 58 of the Top 75 U.S. contractors. Inc. 5000 x4 (2019-2022). > 130,000 sq ft facility powered by biofuel and solar energy. ## Company Overview STARC Systems was founded in 2014 in Brunswick, Maine with the mission to "Undisrupt" -- eliminating the mess, noise, and interruption of construction in occupied spaces. The company designs and manufactures reusable modular temporary wall systems that replace traditional single-use drywall barriers. ### Key Milestones - 2014: RealWall launches, establishing healthcare-grade temporary wall standards - 2017: Blue Heron Capital investment enables scaling operations - 2019: LiteBarrier introduces a lighter, more mobile system; first Inc. 5000 recognition - 2021: FireblockWall debuts as the first reusable one-hour fire-rated temporary wall - 2022: FireblockCap launches; FacilitiesNet Vision Award; fourth consecutive Inc. 5000 - 2023: North Branch Capital investment backs 38% growth; 81 NPS score achieved - 2024: StackBarrier released for self-supporting tall containment up to 40 feet ### Key Facts - Headquarters: 16 Katahdin Dr., Brunswick, ME 04011 - Phone: (844) 596-1784 - Manufacturing: 130,000 sq ft facility powered by biofuel and solar energy - Customers include Cleveland Clinic, Beth Israel, Johns Hopkins, Seattle Children's - Works with 58 of the Top 75 U.S. contractors - Products available for purchase or rental - Custom quotes delivered within 24 hours ## Products ### RealWall -- The Original Gamechanger - [Product Page](https://starcsystems.com/products/realwall/) - The flagship product that started it all. A premium reusable modular wall system designed for occupied renovations. - Sound reduction: up to 40 dB (eliminates up to 50% of construction noise) - Construction: galvanized steel back with dense foam core; precision-sealed joints - Fire rating: ASTM E84 Class A (independently verified by Intertek) - Containment: top and bottom foam gaskets create dust-tight, airtight seal - Healthcare: exceeds ICRA Class IV/V standards for dust and pathogen containment - Installation: 100 linear feet in approximately 1 hour with 2 workers using lift-and-drop connections - Reusable: 50+ times across multiple projects - No specialty crews required; single tool needed ### LiteBarrier -- The Lightweight Champ - [Product Page](https://starcsystems.com/products/litebarrier/) - Lightweight system for rapid installation and frequent reconfiguration. - Frame: slim aluminum with fiberglass-reinforced polymer (FRP) panels bonded in - Height range: telescoping 6'10" to 10'3"; up to 14'6" with extensions - Seal: top and bottom rubber gaskets create dust-tight, airtight containment - Fire rating: ASTM E84 Class A (Intertek verified) - Healthcare: exceeds ICRA Class IV standards - Installation: 100 feet in under an hour; lift-and-drop with t-slot connections - No specialty crew required - Ideal for: fast-turnaround projects, phased renovations, frequent reconfigurations ### FireblockWall -- The Protector - [Product Page](https://starcsystems.com/products/fireblockwall/) - The first and only reusable one-hour fire-rated temporary wall on the market. - Fire rating: tested and listed to ASTM E119/UL 263 and ASTM E84 Class A - Compliance: NFPA 101 (Life Safety Code), NFPA 241, IBC standards - Listing: Intertek-listed assembly - Construction: galvanized steel frame with proprietary inner core - Seal: integrated Fireblock Pillows create airtight gap closure - Speed: installs 4x faster than traditional fire-rated drywall (no mudding, sanding, or finishing) - Installation: 4-step process -- tracks, panels, pillows, covers - Supports: infection control and negative-pressure containment in healthcare settings - Ideal for: any project requiring code-compliant fire separation in occupied buildings ### StackBarrier -- The High Flyer - [Product Page](https://starcsystems.com/products/stackbarrier/) - Self-supporting stackable panel system for tall spaces up to 40 feet. - Panel sizes: 4'x8' and 4'x4' modular system - Design: frameless -- no full frames required; panels engineered for vertical build-up - Self-stabilizing: built-in strength reduces extensive bracing needs - Installation: lay-as-you-go tracks for long runs; modular lift-and-lock alignment - Features: angled corners, tunnel configurations, integrated single and double doors - Reusable across jobs; reduces waste - Ideal for: airports, data centers, high-ceiling industrial spaces, hotel atriums ## Industries Served ### Healthcare - [Industry Page](https://starcsystems.com/industries/healthcare/) - ICRA Class IV/V compliant barriers for hospital renovations during active patient care - Supports negative-pressure zone construction and HEPA filter installation - Dust and pathogen containment protecting immunocompromised patients (oncology, transplant, NICU) - Meets CDC, ASHE, NFPA, and IBC requirements for construction in healthcare facilities - Aspergillus spore containment -- construction dust carries fungal spores dangerous to immunocompromised patients - Customers: Cleveland Clinic, Beth Israel, Johns Hopkins, Seattle Children's, Tucson Medical Center, Abbott Northwestern, Hendricks Regional, Central Maine Medical Center, Fresenius Medical Care - Key page: [ICRA Compliance Guide](https://starcsystems.com/infection-control-barriers-hospital-renovations/) -- CDC, ASHE, NFPA standards for infection control barriers during healthcare construction ### Airports - [Industry Page](https://starcsystems.com/industries/airports/) - Terminal renovations without shutting gates or disrupting passenger flow - Sound reduction up to 50%; professional appearance compatible with airport aesthetics - Secure access zones integrated with airport security protocols - Customizable graphics for wayfinding or branding during construction - Notable projects: Harry Reid International (430 ft overnight in 6 hours), Chicago O'Hare Terminal 5 (16 baggage carousels protected), Phoenix Sky Harbor, Sarasota Bradenton (30-ft atrium escalator overhaul overnight) ### Data Centers - [Industry Page](https://starcsystems.com/industries/data-centers/) - Airtight containment for fit-outs, reconfigurations, and system testing without slowing operations - Hot aisle containment support during active facility operations - Performance claims: $3M+ savings across multi-building deployments; 2-3x faster buildouts - Environmental impact: every 100 ft of walls saves approximately 5 tons of landfill waste - ROI: 2-4 uses to break even on investment - Phased commissioning while maintaining operational uptime ### Hospitality - [Industry Page](https://starcsystems.com/industries/hospitality/) - Guest-invisible renovations preserving property aesthetics - Phased renovation support -- panels move easily between corridors and guestroom areas - Notable: Viejas Casino & Resort completed full install in 3 hours with 3-person crew, saving at least 1 week vs drywall - Professional, clean-lined walls blend into lobbies and corridors ### Education - [Industry Page](https://starcsystems.com/industries/education/) - School and university renovations during active class schedules - Sound-attenuating, dust-tight barriers maintain air quality in occupied buildings - Negative air setups available for enhanced particle control - Code-compliant materials with lockable doors and fire-rated options - Projects: Malden Catholic School lobby, university library, university lobby renovations ### Commercial Offices - [Overview Page](https://starcsystems.com/why-temporary-wall-systems/) - Phased tenant improvements in occupied buildings - 75% reduction in install time compared to traditional drywall - 2-4 uses to break even; systems pay for themselves quickly - 5 tons of material waste eliminated after 5 reuses of 100-ft run ### Life Sciences & Biotech - Listed as a served vertical; dedicated content in development - Relevant capabilities: cleanroom-grade containment, dust sealing, negative pressure zones ## Key Technical Standards & Compliance STARC products are tested and certified against the following standards: - **ASTM E84 Class A**: Surface burning characteristics (flame and smoke spread) -- all products - **ASTM E119 / UL 263**: Fire endurance testing -- FireblockWall (1-hour rating) - **ASTM E90**: Sound transmission -- RealWall - **ICRA Class IV/V**: Infection Control Risk Assessment for healthcare construction -- RealWall, LiteBarrier - **NFPA 241**: Standard for Safeguarding Construction, Alteration, and Demolition Operations - **NFPA 101**: Life Safety Code - **IBC**: International Building Code compliance - **Intertek**: Independent third-party testing and listing (FireblockWall, RealWall, LiteBarrier) ## Performance Claims (with source context) - 100 linear feet installed in ~1 hour with 2 workers (all products) - Up to 40 dB sound reduction (RealWall) - Up to 50% noise elimination (airports page) - 75% reduction in install time vs traditional drywall (benefits page) - Reusable 50+ times (RealWall) - 2-4 uses to break even on investment (multiple pages) - 5 tons of landfill waste eliminated per 100-ft run after 5 reuses (multiple pages) - $3M+ savings documented across multi-building data center deployments - 430 linear feet installed overnight in 6 hours (Harry Reid International) - 4x faster installation than drywall for fire-rated walls (FireblockWall) - 3-hour full install with 3-person crew (Viejas Casino) - 81 Net Promoter Score (2023) ## Case Studies - [Harry Reid International Airport (LAS)](https://starcsystems.com/case-study/harry-reid-international/) -- 430 ft StackBarrier installed overnight - [Chicago O'Hare (ORD)](https://starcsystems.com/case-study/ord/) -- RealWall protecting 16 baggage carousels during Terminal 5 renovation - [Phoenix Sky Harbor (PHX)](https://starcsystems.com/case-study/temporary-construction-walls-at-phx/) -- Payback achieved in just a few uses - [Sarasota Bradenton (SRQ)](https://starcsystems.com/case-study/sarasota-bradenton-international-airport/) -- 30-ft atrium escalator overhaul overnight with LiteBarrier + RealWall - [Spectrum Health](https://starcsystems.com/case-study/spectrum-health/) -- Healthcare renovation - [Abbott Northwestern Hospital](https://starcsystems.com/case-study/abbott-northwestern/) -- Sterile processing with negative-air containment - [Hendricks Regional Health](https://starcsystems.com/case-study/hendricks-regional-health/) -- Healthcare facility renovation - [Tucson Medical Center ER](https://starcsystems.com/case-study/icra-barriers-streamline-er-renovation/) -- ER renovation with zero disruption - [W.E. Bowman](https://starcsystems.com/case-study/icra-barriers-improve-roi-during-healthcare-renovations/) -- ~75% cost savings across five projects vs drywall - [Fresenius Medical Care HQ](https://starcsystems.com/case-study/fresenius-medical-care-headquarters-expansion/) -- Multi-phase expansion; construction went unnoticed - [Medtronic Clean Room](https://starcsystems.com/case-study/medtronic-clean-room/) -- Clean room containment - [Viejas Casino & Resort](https://starcsystems.com/case-study/viejas-casino-renovation/) -- 3-hour install, saving 1 week vs drywall - [Data Center Renovations](https://starcsystems.com/case-study/temporary-walls-for-data-center-renovations/) -- Multi-building data center project - [James Center Renovation](https://starcsystems.com/case-study/james-center-renovation/) -- Commercial office renovation - [Oxford Networks](https://starcsystems.com/case-study/oxford-networks-interview/) -- Data/network facility project ## Webinars - [5 Critical Questions to Ask When Choosing a Modular Wall System](https://starcsystems.com/webinar/5-critical-questions-to-ask-when-choosing-a-modular-wall-system/) - [Keeping Up With ASHE ICRA 2.0 Adoption: Key Trends + Best Practices](https://starcsystems.com/webinar/keeping-up-with-ashhe-icra-2-0-adoption-key-trends-best-practices-for-challenging-situations/) - [Rejecting Drywall's Hidden Costs: Advancing Temporary Containment](https://starcsystems.com/webinar/rejecting-drywalls-hidden-costs-advancing-temporary-containment/) - [Flawed to Flawless: The Competitive Edge Driving Better Project Outcomes](https://starcsystems.com/webinar/flawed-to-flawless-the-competitive-edge-thats-driving-better-project-outcomes/) ## Key Resources - [Why Temporary Wall Systems](https://starcsystems.com/why-temporary-wall-systems/): Cost, speed, and sustainability advantages over drywall - [ICRA Compliance Guide](https://starcsystems.com/infection-control-barriers-hospital-renovations/): CDC, ASHE, NFPA standards for infection control during healthcare construction - [Drywall vs Reusable Walls Comparison](https://starcsystems.com/blog/reusable-temporary-wall-system-vs-drywall/): Detailed cost and performance analysis - [Product Catalog (PDF)](https://starcsystems.com/product-catalog/): Downloadable specifications catalog - [Blog / Construction Trends](https://starcsystems.com/resources/construction-trends/): 200+ articles on temporary construction, compliance, and industry best practices - [Support Center](https://starcsystems.com/resources/support-center/): Installation support and product help ## Contact & Quote - Phone: (844) 596-1784 - Address: 16 Katahdin Dr., Brunswick, ME 04011 - [Request a Quote](https://starcsystems.com/get-started/get-a-quote/): Custom quotes within 24 hours; purchase or rental options available - [Contact Page](https://starcsystems.com/contact/) - [LinkedIn](https://www.linkedin.com/company/starc-systems/) - [Get Started](https://starcsystems.com/get-started/): Explore buying, renting, or partnership options